3:00 PM, 15°C RAIN, POSSIBLY HEAVY. VERY WINDY. Tue 21 Apr 2015(SYDNEY TIME)

Adverse weather may lead to flight delays and traffic delays on the ground. Please allow extra time to travel to and from the airport. Flight information.

Office Development

ADVERTISEMENT

In May 2002, the then Federal Minister for Transport and Regional Services advised Sydney Airport Corporation Limited (SACL) that approval had been granted to a Major Development Plan (MDP) for the development of two office buildings in the International Terminal Precinct at Sydney Airport.

The proposal described in the Major Development Plan will result in the development by SACL of two office buildings on a 1.3 hectare site fronting Cooks River Drive in the International Terminal precinct at Sydney Airport. 

The proposal involves:

  • Two office buildings with a total of up to 27,000 square metres net lettable area (NLA)

  • Above ground car parking for 250 vehicles within the buildings


The Major Development Plan was approved by the Minister on 31 May 2002 following a statutory 90-day period of public exhibition and consultation.

A copy of the Major Development Plan can be downloaded using the links below:

 Cover to Contents (95kB)

 Summary (76kB)

 Chapter 1 Introduction (67kB)

 Chapter 2 Background and Need (0.9MB)

 Chapter 3 The Proposed Development (1MB)

 Chapter 4 Environmental Assessment and Management (1.5MB)

 Chapter 5 Consultation (42kB)

 Chapter 6 Statutory and Policy Compliance (92kB)

 Appendices Schedule (38kB)

 Appendix A Team (38kB)

 Appendix B Public Comment Certificate (67kB)

 Appendix C Outline EMP (0.1MkB)

 Appendix D Consultation (62kB)

 Appendix E Section 91 Compliance (39kB)